Quantcast
Channel: Patch
Viewing all articles
Browse latest Browse all 9684

Railroad Crossing Construction Temporarily Closing Portion of Diehl Road

$
0
0
Closeup of flashing lights on top of a collection of wet barricades.

Construction on a railroad crossing is expected to close all traffic for a week at Diehl Road and the Canadian National Railroad, according to the city of Naperville.

The railroad crossing will be closed to all traffic for about one week so that crews are able to perform maintenance and safety work at the crossing that is located between Eola Road and Route 59, according to the city of Naperville.

Crews will be replacing the crossing surface on Diehl Road, upgrading train switches and installing gates for the Illinois Prairie Path, according tot he city. Detour signs will be posted along Route 59 and North Aurora, Ferry and Eola roads. Drivers are encouraged to use alternative routes. 

The railroad crossing will be closed to all traffic, including vehicle, bicycle and pedestrian traffic starting at 8:30 a.m. April 30. It is anticipated that, weather permitting, the crossing will reopen by 6 p.m. May 6, the city said.

 

 


Viewing all articles
Browse latest Browse all 9684

Latest Images

Trending Articles



Latest Images